New Basement Stairs: Part 2 – Building the Stairs
Once the stair opening was ready, it was time to install the stringers and build the stairs. Substairs Our contractor was originally supposed to only install the stair stringers, but…
Once the stair opening was ready, it was time to install the stringers and build the stairs. Substairs Our contractor was originally supposed to only install the stair stringers, but…
When we opened the dining room, we wanted to also widen our basement stairs. But at that point we thought that we would have to reroute our radiator pipes, so…
Once the floors were finished, we were ready to finish our stair upgrade. Handrail During our design, we determined that both the handrail and baserail would be exactly 2½” wide.…
We originally planned to hire someone to come and rebuild our stairs – both in the basement and the handrail on the second floor. But as our basement work progressed,…