Backyard Renovation: Floating Deck (Phase 6)
Phase 6 was supposed to be the final step in our backyard renovation plan. Our garage was supposed to be done in early May and I’d have all summer to…
Phase 6 was supposed to be the final step in our backyard renovation plan. Our garage was supposed to be done in early May and I’d have all summer to…
A couple of years ago, I build a new staircase and wall to the basement which included a built-in bookshelf in the wall. At the time, I chose to stain…
It’s been more than 3 years since we built our new basement stairs and we’ve been living dangerously without a handrail – on either side! – for the entire time.…
Like most basements, we’ve used ours for storing things we don’t use everyday. It’s also become the “I don’t have the energy to deal with this, so throw it in…
The birth of our twins made our house feel very small. All of a sudden, almost twice the number of people were living in our house. Plus, with all of…
When we rebuilt the basement stairs, we wanted them to be against a new wall that hid the fact that we did not have a straight or flush wall going…
When we started out kitchen renovation project, we knew that we’d have to replace our deck at some point but planned to push it off until next summer. Unfortunately the…
Once the stairs themselves were finished, I still had to sort out how to build the handrail. I knew that I wanted it to match the style of what I…
Once the stair opening was ready, it was time to install the stringers and build the stairs. Substairs Our contractor was originally supposed to only install the stair stringers, but…
When we opened the dining room, we wanted to also widen our basement stairs. But at that point we thought that we would have to reroute our radiator pipes, so…
It’s been two years since we bought our house and it’s amazing how much has changed. In addition to our downstairs renovation, we have now completed our upstairs renovation. We…
One of the final steps in finishing our second floor renovation was installing the baseboards. Our floors were installed and finished, our walls were painted and we were ready to…
Once the floors were finished, we were ready to finish our stair upgrade. Handrail During our design, we determined that both the handrail and baserail would be exactly 2½” wide.…
We waited until the middle of October to start installing the hardwood on the second floor. Not only is the humidity level great in the Fall (somewhere between the extreme…
We originally planned to hire someone to come and rebuild our stairs – both in the basement and the handrail on the second floor. But as our basement work progressed,…
We are renovating our basement in two phases. Phase 1 is simply underpinning the basement, replacing all the drains, and building new stairs. The second phase will be finishing the…
After investigating a kitchen renovation, we decided to renovate our basement first. The most compelling case for the switch in scope was made by our real estate agent who reassured…
It’s been a year since we bought our house and a lot has changed. We’ve replaced our electrical wiring, fixed our fireplace, replaced our hardwood floor, painted the walls, installed…